Civil and infrastructure case studies

Aspire 'stair in a day' for soldiers
 
Health - Mental Health Unit, Walsgrave Hospital, Coventry
The mental health unit with a footprint of 8700 m2 was constructed alongside an existing entrance to the hospital. Our teams worked closely with Skanska to develop a solution that offered the best combination of off-site manufacture and speed of asse
 
BAA East Terminal works - night time bridge
Bourne Off-Site Solutions has recently completed another complex night time steel erection for the preenabling works for the new Heathrow East Terminal, further demonstrating the exceptional capabilities of their Airport Installations team.
 
SmartLIFE project confirms benefits of steel
The genesis of the SmartLIFE was a demonstration project in which benefits of Modern Methods of Construction (MMC) in housing were assessed on site. The project was a mixture of private tenure and social housing, constituting 106 2-storey units of tw
 
New Sports Hall, Winton School, London
 
Precast concrete system for railway platforms
Project to install a modular platform system to extend railway station platforms on the Chiltern Railways line between London Marylebone and Birmingham Snow Hill.
 
BAA Pier 6 connector construction
The taxi way was closed for only 10 days during this project while the pier was put into place.
 
Pipe modules for a commercial office building
This project achieved savings in cost of manufacture, construction installation; time on site; and process costs. The offsite models were considered "significantly better" in level of quality than traditional ones.