Skip to main content

Case studies

This section comprises case studies from Buildoffsite that provide a useful insight into a range of construction projects.

Civil and infrastructure case studies

View all civil and infrastructure case studies...

SmartLIFE project confirms benefits of steel
The genesis of the SmartLIFE was a demonstration project in which benefits of Modern Methods of Construction (MMC) in housing were assessed on site. The project was a mixture of private tenure and social housing, constituting 106 2-storey units of tw
 
Health - Mental Health Unit, Walsgrave Hospital, Coventry
The mental health unit with a footprint of 8700 m2 was constructed alongside an existing entrance to the hospital. Our teams worked closely with Skanska to develop a solution that offered the best combination of off-site manufacture and speed of asse
 
Pipe modules for a commercial office building
This project achieved savings in cost of manufacture, construction installation; time on site; and process costs. The offsite models were considered "significantly better" in level of quality than traditional ones.
 

Housing and residential case studies

View all housing and residential case studies...

Accommodation - Holiday Inn, Glasgow City Centre
Recently benefiting from a £2m investment and winning the Scottish Business Hotel of the Year award, the four star Holiday Inn Glasgow City Centre occupies a pivotal position in the heart of Glasgow's Theatreland.
 
New Student Accommodation, University of Southampton
The design aims to reflect the stimulating learning environment of the University and its progressive culture. A variety of contemporary materials were used for the external façades, including terracotta tiles, timber and metal cladding.
 
Accommodation - Crowne Plaza, London Docklands
One of the UK's most modern business hotels, the Crowne Plaza London Docklands is a four star superior hotel consisting of 210 bedrooms and featuring contemporary styling to appeal to a cross section of visitors in London. Buchan Concrete Solutions
 

Community and social case studies

View all community and social case studies...

New Student Accommodation, University of Southampton
The design aims to reflect the stimulating learning environment of the University and its progressive culture. A variety of contemporary materials were used for the external façades, including terracotta tiles, timber and metal cladding.
 
Recycled and refurbished modular building - nursery, London Docklands
The use of pre-owned modular buildings generated 10 per cent of the carbon emissions and used less than 10 per cent of the energy during construction.
 
Education - Ravensbury Community Primary School
The project involved the amalgamation of the junior and infant schools onto a single site to provide facilities flexible enough to ensure the correct delivery of education over the next 50 years.
 

Public sector case studies

View all public sector case studies...
Precast concrete components
The precast concrete units used for the Garden Quadrangle, St Johns College, Oxford, have different surface textures to emphasise different elements of the structure and to simulate some of the surface finishes found in traditional stone-built classi
 
Health - Mental Health Unit, Walsgrave Hospital, Coventry
The mental health unit with a footprint of 8700 m2 was constructed alongside an existing entrance to the hospital. Our teams worked closely with Skanska to develop a solution that offered the best combination of off-site manufacture and speed of asse
 
New Teaching Resource Centre, Birchwood High School, Bishop's Stortford
The principle advantages of offsite construction for this project were reductions in site time of around 50 per cent, less disruption to staff and pupils at the school during construction, and the highest quality of finish both internally and externa
 

Retail and commercial case studies

View all retail and commercial case studies...
Shepton Mallet Treatment Centre
The £12m project is the UK's first ISTC to be built off-site and is believed to be the most complex modular building project in the UK. The 4100sq.m centre was built in less than 10 months and is carrying out more than 11 000 operations every y
 
Pipe modules for a commercial office building
This project achieved savings in cost of manufacture, construction installation; time on site; and process costs. The offsite models were considered "significantly better" in level of quality than traditional ones.
 
Accommodation - Holiday Inn, Glasgow City Centre
Recently benefiting from a £2m investment and winning the Scottish Business Hotel of the Year award, the four star Holiday Inn Glasgow City Centre occupies a pivotal position in the heart of Glasgow's Theatreland.
 

Sustainability case studies

View all sustainability case studies...