Retail and commercial case studies

Shepton Mallet Treatment Centre
The £12m project is the UK's first ISTC to be built off-site and is believed to be the most complex modular building project in the UK. The 4100sq.m centre was built in less than 10 months and is carrying out more than 11 000 operations every y
 
Accommodation - Holiday Inn, Glasgow City Centre
Recently benefiting from a £2m investment and winning the Scottish Business Hotel of the Year award, the four star Holiday Inn Glasgow City Centre occupies a pivotal position in the heart of Glasgow's Theatreland.
 
Precast reconstituted stone cladding
A more economical solution of using reconstituted stone rather than Portland stone was used on this project.
 
Recycled and refurbished modular building - nursery, London Docklands
The use of pre-owned modular buildings generated 10 per cent of the carbon emissions and used less than 10 per cent of the energy during construction.
 
Pipe modules for a commercial office building
This project achieved savings in cost of manufacture, construction installation; time on site; and process costs. The offsite models were considered "significantly better" in level of quality than traditional ones.